I need help thank you
40 Howell Corporation's activity-based costing system has three activity cost pools-Machining, Setting Up, and Other. The company's overhead costs, which consist of equipment depreciation and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Equipment depreciation (total) $ 34, 400 Indirect labor (total) $ 7,730 Distribution of Resource Consumption Across Activity Cost Pools 01 56 02 Machining Setting Up Other Equipment depreciation 0.30 0. 30 0. 40 Indirect labor 0 .40 0.20 0. 40 Costs in the Machining cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. MHS Batches Product 54 14, 700 700 Product CO 5 , 300 1, 500 Total 20, 000 2, 200 Additional data concerning the company's products appears below: Product S4 Product CO Sales (total) $ 81, 500 $ 69,000 Direct materials (total) $ 25,806 $ 28,500 Direct labor (total) $ 41, 000 $ 25, 800 Required: a. Assign overhead costs to activity cost pools using activity-based costing. b. Calculate activity rates for each activity cost pool using activity-based costing. c. Determine the amount of overhead cost that would be assigned to each product using activity-based costing d. Determine the product margins for each product using activity-based costing Complete this question by entering your answers in the tabs below. Required A Required B Required C Required D Assign overhead costs to activity cost pools using activity-based costing. Activity Cost Pools Machining Setting Up Other Total Equipment depreciation Indirect labor Total Required A Required B > Required A Required B Required C Required D Calculate activity rates for each activity cost pool using activity-based costing. (Round your answers to 2 decimal places.) Activity Cost Pools Activity Rate Machining per MH Setting up per batch Required A Required B Required C Required D Determine the amount of overhead cost that would be assigned to each product using activity-based costing. (Round intermediate calculations to 2 decimal places.) Amount of Overhead Cost Product S4 Product CO Required A Required B Required C Required D Determine the product margins for each product us Required D places.) sed costing. (Round intermediate calculations to 2 decimal Product Margin Product S4 Product CO