Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

I need help with C. Steve Hannon, sales manager, has received an order for 250 stairways from Community Builders, Inc., a large housing development contractor.

I need help with C.
image text in transcribed
image text in transcribed
Steve Hannon, sales manager, has received an order for 250 stairways from Community Builders, Inc., a large housing development contractor. At Steve's request, Bill prepares cost estimates for producing components for 250 stairways so Steve can submit a contract price per stairway to Community Builders. He accumulates the following data for the production of 250 stairways. Direct materials $103.600 Direct labor $112,000 Machine hours 14,500 Direct labor hours 5,000 Number of purchase orders 60 Number of material moves 800 Number of machine setups 100 Number of inspections 450 Number of components 16,000 Number of square feet occupied 8,000 Instructions a. Compute the predetermined overhead rate using traditional costing with machine hours as the basis. b. What is the manufacturing cost per stairway under traditional costing? (Round to the nearest cent.) c. What is the manufacturing cost per stairway under the proposed activity-based costing? (Round to the nearest cent. Prepare all of the necessary schedules.) d. Which of the two costing systems is preferable in pricing decisions and why? b. Cost/stairway Si C. Cost/Stairway $1 . Are missin WA are results compare P17.3A (LO 1, 2), AN Writing Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) per mit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manu- facturing overhead costs for the year 2022 are as follows. Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted overhead costs Amount $ 75,000 82,000 210,000 105,000 90,000 126,000 180,000 $868,000 For the last 4 years, Shaker Stairs Co. has been charging overhead to products on the basis of ma- chine hours. For the year 2022, 100,000 machine hours are budgeted. Jeremy Nolan, owner-manager of Shaker Stairs Co., recently directed his accountant, Bill Seagren, to implement the activity-based costing system that he has repeatedly proposed. At Jeremy Nolan's request, Bill and the production foreman identify the following cost drivers and their usage for the previously budgeted overhead cost pools. Estimated Use of Activity Cost Pools Cost Drivers Cost Drivers Purchasing Number of orders 600 Handling materials Number of moves 8,000 Production (cutting, milling, finishing) Direct labor hours 100,000 Setting up machines Number of setups 1.250 Inspecting Number of inspections 6.000 Inventory control (raw materials and finished goods) Number of components 168,000 Utilities Square feet occupied 90,000 o

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions

Question

Draw a schematic diagram of I.C. engines and name the parts.

Answered: 1 week ago