I need help with number 3. Create a new tab titled Actual. Provide a summary statement that recommends reducing costs without lowering labor rates. Prompt:

I need help with number 3. Create a new tab titled Actual. Provide a summary statement that recommends reducing costs without lowering labor rates.

image text in transcribed
Prompt: Using the Labor Hours spreadsheet. expand the table in the Data tab to capture the actual cost of this project by performing the following steps: 1. Totalthe complete Ia hor cost. a} Add a column that totals the labor for each employee, given the added criteria. [See the last two bullets in the scenario box below.) b) Total the complete labor cost. 2. Think about what additional costs would contribute to the overall cost of the project. a} Below is a list to consider. Add additional columns to capture these costs. (Mom: Not all of these should he Included: read each bullet carefully.) I. The project is located 30 miles from the ofce, and the company pays the employees .SA-C per mile to travel to the worksite and back. ii. You are using $1,000 in materials left over from another project. iii. Because the worksite is in a remote location, a portable office with restrooms had to be leased at a cost of $300 per day. iv. At the cost of $350 per employee. the company provides all employees with uniforms and safety equipment. This equipment is replaced on a yearly basis. v. The company pays for a 560 food platter to be delivered to the site every day to feed all of the workers. vi. Fuel to run the generator in the portable ofce costs $10 per day and is included in the lease agreement. vii. A security service had to be contracted by the company to safeguard the worksite 24 hours a day at the cost of $720 per day. h) Totalthe entire project cost. 3. Create a new tab titled Actual. Provide a summary statement that recommends reducing costs without lowering labor rates. Scenario You are examining labor costs for a construction project using eight employees: 0 The eight employees' names are: Smith, Rodriquez, Daniel, Eli. Lee, Kim, Buster, and Green. 9 Each employee worked eight hours a day for ve days. 0 The employees' wages per hour are as follows: 0 Smith: $3.95 0 Rodriguez: 51.1 0 Daniel: 514 o Eli: 516 0 Lee: 519 Southern New Hampshme Unmrsny 0 Kim: 520 o Buster: $25 0 Green: 540 0 Green, Ki m, Eli, and Lee are fu ll-time employees. and the others a re contract employees. 9 The cost of overhead per hour for a fulltime employee is 40% of their hourly rate. I The cost of overhead per hour for a contract employee is 20% of their hourly rate

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Elements Of Chemical Reaction Engineering

Authors: H. Fogler

6th Edition

013548622X, 978-0135486221

Students also viewed these Accounting questions