I need help with these Footing is 400x 200 0.4 40 . 2 ESTIMATE Project: SINGLE FAMILY HOME - Windermere Project No 0002 Estimate No

image text in transcribed

I need help with these

image text in transcribed
Footing is 400x 200 0.4 40 . 2 ESTIMATE Project: SINGLE FAMILY HOME - Windermere Project No 0002 Estimate No Element/Trade Page: 1.DO of 10 Measured ElementUCI Reference Estimate Type Date Extended Priced Checked Description No Dimensions Extensions Quantity Uni (8) Brought Forward from Page RECAP 02100 - SITE PREPARATION 02110 - Site clearing 1. grubbing 5 30.71 42.76 16566 m2 02200 - EARTHWORK 02220 - Excavating 1. Excavate for basement 5 43 72.6 m3 2. Excavate for foundation trenches 5 431 0.4 2.6 3. Backfill with selected exc Material 5 m3 Backfill with sand 5 m3 5. Backfill with granular "A" fill 5 m3 6. Disposal of excavated material 5 m3 03100 - CONCRETE FORMWORK 03110 - Structural CIP concrete formwork 1. Formwork to fan wall footing, 430 mm wide 5 m Formwork to foundation pad footings 5 m2 3. Formwork to foundation wall 5 m2 4. Formwork to pier 5 m 5. Form keyway 5 13 03200 - CONCRETE REINFORCEMENT 03220 - Welded wire fabric 1. 6 x 6 welded wire mesh reinf 5 m2 03250 - Concrete Accessories 5 Carried Forward to Page 250 40

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Global Strategy

Authors: Mike W. Peng

5th Edition

0357512367, 978-0357512364

Students also viewed these Mathematics questions

Question

Explain the steps involved in training programmes.

Answered: 1 week ago