Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

I need help with: total variable cost per unit and the schedule of fixed costs PART 1 Fixed and Variable Cost Determinations Unit Cost Calculations

I need help with: total variable cost per unit and the schedule of fixed costs

image text in transcribed

image text in transcribed

image text in transcribed

PART 1 Fixed and Variable Cost Determinations Unit Cost Calculations The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp are: Lamp Kit: Direct Labor: Variable Overhead: Fixed Overhead: $16.0000000 per lamp 2.0000000 per lamp (4 lamps/hr.) 2.0000000 per lamp 10.0000000 per lamp (based on normal capacity of 25,000 lamps) Cost per lamp: $30.0000000 per lamp Expected increases for 20x2 When calculating projected increases round to TWO ($0.00) decimal places. 1. Material Costs are expected to increase by 4.50%. 2. Labor Costs are expected to increase by 3.50%. 3. Variable Overhead is expected to increase by 4.50%. 4. Fixed Overhead is expected to increase to $280,000. 5. Fixed Administrative expenses are expected to increase to $48,000. 6. Variable selling expenses (measured on a per lamp basis) are expected to increase by 5.50%. 7. Fixed selling expenses are expected to be $25,000 in 20x2. 8. Variable administrative expenses (measured a per lamp basis) are expected to increase by 6.00%. On the following schedule develop the following figures: 1- 20x2 Projected Variable Manufacturing Unit Cost of a lamp. 2- 20x2 Projected Variable Unit Cost per lamp. 3- 20x2 Projected Fixed Costs. I See The Light, Inc Schedule of Projected Costs Variable Manufacturing Unit Cost 20x 1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places $16 Lamp Kit Labor Variable Overhead $2.00 $ 2 4.50% 3.50% .50% $16.72 $2.07 $2.09 {4.01) {4.02) {4.03) 4 Projected Variable Manufacturing Cost Per Unit 20 $20.88 {4.04) Total Variable Cost Per Unit 20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places Variable Selling Variable Administrative Projected Variable Manufacturing Unit Cost 0.055 0.06 {4.05} {4.06) {4.04} Projected Total Variable Cost Per Unit {4.07) Schedule of Fixed Costs 20x1 Cost 20x2 Cost Projected Percent Increase {4.08} lamps @_) Fixed Overhead (normal capacity of Fixed Selling Fixed Administrative {4.09} {4.10} Projected Total Fixed Costs {4.11}

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing Basics

Authors: 3G E-Learning

1st Edition

1984624261, 978-1984624260

More Books

Students also viewed these Accounting questions

Question

Have I incorporated my research into my outline effectively?

Answered: 1 week ago