I need the yellow parts answered - please ignore the numbers written in the yellow parts. Thanks Standard Job Order Costing Variance Analysis Special order
I need the yellow parts answered - please ignore the numbers written in the yellow parts. Thanks
Standard Job Order Costing Variance Analysis Special order lamps are manufactured in division S. Because of the precise nature of the process a standard cost system has been developed. The following standards are used for the special orders Standards 16.000000 per lamp Lamp Kits 2.400000 per lamp (4 lamps/hr.) Direct Labor 0.250000 per lamp (4 lamps/hr.) Variable Overhead 10.000000 per lamp Fixed Overhead Total 28.650000 Fixed overhead is based on expected production of 4,007 customized lamps each month. To keep records of the actual cost of a job, a Job Order Cost System has been developed. Entries are made to the Job Order System at actual cost (overhead is applied based on actual labor hours) while entries are made to the accounting system at standard. Variance analysis is used to analyze the differencesStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started