ID Control Chart A manager wants to build 3-sigma x-bar control limits for a process. The target value for the mean of the process is
ID Control Chart A manager wants to build 3-sigma x-bar control limits for a process. The target value for the mean of the process is 10 units, and the standard deviation of the process is 3. If samples of size 9 are to be taken, what will be the upper and lower control limits, respectively?
19 and 1 | ||
16 and 4 | ||
13 and 7 | ||
4 and 16 |