IE 5314 - Spring 2032 Project Description The focus of this student design case is on the DTC business. Fair Tender is actively socking assistance in identifying the opportunities for improving their procevies, particularly in light of an expected volume powih in bub the upcoming year and the following year. The opportunities for liaprominent include a new layout, improved material flow, improved information gitems, incremed momation, and Increased personnel support For full credit the main body report must include the following 1 Executive Summary: One page or less well-written; summarises entire report. Provide and highlight key strengths of your design as it applies to the scope of this project 2. Data Profiling and Data Summary I. Detailed labor plan [per shift. per function] 4, Material handling equipment [MHE) plan 5. Total space requirements (with itemized list for each functiond arca]. 6. Proposed technology solution, describe your information technology and systems and its' capabilities focusing on Warehouse management systems. 7. Proposed process design and process flow (to include unloading, receiving put away, picking and shipping) and highlighting the put away and picking strategies 8. Facility maximum capacity (Inbound, Storage, and Outbound] Q. 20 AutoCAD Layout Drawings. Or any other drawing software 10. Investment cost rutimate 11. Mis project plan 12. Design Assumptions I- The main body of the repon must be in MS Power Point as typically provided in the inchdry and must nood cooked W0alhikes, All team will make oral presentation at the end of by computer in order to that their knowledge with the class Each team will use MS PowerPoint for the slides and plan in speak for only 12 minutes + 3 minutes Q&A. Thin should provide a fun and meaningful learning coperience. 2- Excel file to show all calculations and assumptions