if a company raw processing time is 15 mins, Wo is 2.75, bottleneck is 11 jobs per hour or 5.5 minsthroughput line is 10.5 switches
if a company raw processing time is 15 mins, Wo is 2.75, bottleneck is 11 jobs per hour or 5.5 minsthroughput line is 10.5 switches per hour, WIP is 7 jobs, CT is 0.6667 and THworst is 4 switches per hour.
- Is there any room for improvement on this line?