Question
If a U.S. Navy sensor has a design problem, can the contractor be required to fix the sensor at no additional cost since the Navy
If a U.S. Navy sensor has a design problem, can the contractor be required to fix the sensor at no additional cost since the Navy approved the design at critical design review? The nonconformance was found during the initial production and no inspections have been performed on the sensor. What would be the least likely example of a form that would be used to document acceptance and define what type of defect would apply to this problem if the sensor has already been accepted by the Navy?
(Provide references to applicable federal acquisition regulation (FAR) parts)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started