Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

If the excavation diameter of the shaft is 5.0m, allowable time for mucking is 5.0hr per shift and the advance rate of shaft sinking

image

If the excavation diameter of the shaft is 5.0m, allowable time for mucking is 5.0hr per shift and the advance rate of shaft sinking is one round of 3.0m per shift, calculate the bucket size required for the mucking unit. (Requirements: (1) Need consider an adequate swell factor for rock fragmentation and apply it correct in calculation (applying swell factor correctly, 1 marks). (2) Need detail the circle time composition for mucking and hoisting (main calculation part, 2 marks). (3) Need use efficiency hour for the bucket productivity (applying efficiency hour correctly, 1 mark).

Step by Step Solution

There are 3 Steps involved in it

Step: 1

To calculate the bucket size required for the mucking unit in shaft sinking we need to consider the ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Statistics For Business Decision Making And Analysis

Authors: Robert Stine, Dean Foster

2nd Edition

978-0321836519, 321836510, 978-0321890269

More Books

Students also viewed these Mechanical Engineering questions