If there is a 5% risk of overreliance, the expected deviation rate is 3%, the tolerable rate of deviation is 6%, and the actual number
If there is a 5% risk of overreliance, the expected deviation rate is 3%, the tolerable rate of deviation is 6%, and the actual number of deviations found is 1,
- ULRD
- ULRD>TRD.
- Preliminary Control Risk cannot be accepted.
- 1 and 3 only.
- 2 and 3 only.