Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

I'm having trouble with the 1-Sided upper limit using IDEA. Use the sample sizes and the number of deviations determined below. Control Procedure 5 Paraeters

I'm having trouble with the 1-Sided upper limit using IDEA. image text in transcribed
Use the sample sizes and the number of deviations determined below. Control Procedure 5 Paraeters Risk of incorrect acceptance Tolerable deviation rate Expected population deviation rate Sample site (uning tables) Sample size (using IDEA) 50 41 1 156 156 10 7 25 94 94 181 98 Determine the sample deviation rate, the computed upper deviation rate, and the auditor's conclusion (ie, testing results do or do not support operating effectiveness of the control) for each control procedure. (For Results, use Table 8-8 & Table 8-9 or IDEA) (Round your rates values to 1 decimal place.) Control Procedure 5 3 Results Number of deviations Samples Sample deviation rate Compled upper deviation rate using Tables 1-Sided upper limit using IDEA Auditor's conclusion % % X % % % % % %

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Integrated Reporting

Authors: Chiara Mio

1st Edition

1137551488, 9781137551481

More Books

Students also viewed these Accounting questions

Question

Describe three forms of conflict from the work of Lewin.

Answered: 1 week ago