Answered step by step
Verified Expert Solution
Question
1 Approved Answer
im really confused on this hw assignment please show work, thank you! PN3020 now requires some preparation labor prior to product assembly. Given the information
im really confused on this hw assignment please show work, thank you! PN3020 now requires some preparation labor prior to product assembly. Given the information above for capacity bill development, determine the required capacity for Work Center 400 if 1430 units of PN1000 (End-Product) needs to be produced. Enter your result in hours rounded to 1 decimal place, if annlirable PN3020 now requires some preparation labor prior to product assembly. Given the information above for capacity bill development, determine the required capacity for Work Center 400 if 1430 units of PN1000 (End-Product) needs to be produced. Enter your result in hours rounded to 1 decimal place, if applicable. Feedback Based on answering incorrectly Incorrect. Note from the BOM tree that 2 units of PN2001 is required for each PN1000, but 3 units of PN3020 is required for each PN2001. Therefore. 6 units of PN3020 is required for each unit of PN1000, and the unit capacity requirement is multiplied by 6 . for WC400 needs when referencing the end product (PN1000)
im really confused on this hw assignment please show work, thank you!
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started