In a project, silty soil is to be excavated from a borrow area and used as fill. A test pit having a volume of
In a project, silty soil is to be excavated from a borrow area and used as fill. A test pit having a volume of 0.5 m is excavated in the borrow area. The total mass of the soil excavated from the test pit was 0.94 tonnes and it had a moisture content of (4+)%. The compacted fill is to have a void ratio of e = 0.55 and degree of saturation of S, - (60 + 12/1) 9 = %. (a) If (20,000 + 500.02) m of compacted fill is required in the project, what volume of the silty soil must be excavated from the borrow area? (10 marks) (b) How much water (in tonne) must be added to the excavated material prior to compaction in the fill? (10 marks)
Step by Step Solution
3.46 Rating (149 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get StartedRecommended Textbook for
An Introduction to Geotechnical Engineering
Authors: Robert D. Holtz, William D. Kovacs, Thomas C. Sheahan
2nd edition
132496348, 978-0132496346
Students also viewed these Accounting questions
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
Question
Answered: 1 week ago
View Answer in SolutionInn App