In a project, silty soil is to be excavated from a borrow area and used as fill. A test pit having a volume of

image text in transcribed

In a project, silty soil is to be excavated from a borrow area and used as fill. A test pit having a volume of 0.5 m is excavated in the borrow area. The total mass of the soil excavated from the test pit was 0.94 tonnes and it had a moisture content of (4+)%. The compacted fill is to have a void ratio of e = 0.55 and degree of saturation of S, - (60 + 12/1) 9 = %. (a) If (20,000 + 500.02) m of compacted fill is required in the project, what volume of the silty soil must be excavated from the borrow area? (10 marks) (b) How much water (in tonne) must be added to the excavated material prior to compaction in the fill? (10 marks)

Step by Step Solution

3.46 Rating (149 Votes )

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

An Introduction to Geotechnical Engineering

Authors: Robert D. Holtz, William D. Kovacs, Thomas C. Sheahan

2nd edition

132496348, 978-0132496346

More Books

Students also viewed these Accounting questions