Question
In a sample of35adults, the mean assembly time for a child's swing set was1.78hours with a standard deviation of0.71hours. The makers of the swing set
In a sample of35adults, the mean assembly time for a child's swing set was1.78hours with a standard deviation of0.71hours. The makers of the swing set claim the average assembly time is less than2hours. Test their claim at the0.10significance level.
Show your steps for calculating the P-value (be sure to use the methods taught in this course).
(a) What type of test is this? Choose a, b, or c
- This is a right-tailed test.
- This is a two-tailed test.
- This is a left-tailed test.
(b) Use software to get the P-value of the test statistic. Round to 4 decimal places. P-value =
(c) What is the conclusion regarding the null hypothesis? Choose a or b
- rejectH0
- fail to rejectH0
(d) Choose the appropriate concluding statement. Choose a, b, c, or d
- The data supports the claim that the mean assembly time is less than 2 hours.
- There is not enough data to support the claim that the mean assembly time is less than 2 hours.
- We reject the claim that the mean assembly time is less than 2 hours.
- We have proven that that the mean assembly time is less than 2 hours.
WHAT IS THE FUCTION IN THE CALCULATOR Z-TEST, T-TEST,1-PROPZTEST
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started