in details please, Problem 3: complete all missing items in the cost estimating sheet. The project is a warehouse and the footprint dimesions is shown

image text in transcribed

image text in transcribed

in details please,

Problem 3: complete all missing items in the cost estimating sheet. The project is a warehouse and the footprint dimesions is shown below. Project info: 1. Indirect cost (the proejct is expected to last 3 months; there is no minimum rental period: a. Rental of site trailers: OMR 400/month b. Vehicles: OMR 350/month c. Utilities: OMR 800/month d. Additional indirect cost :4.5 % of the total direct costs 2. Contingency: OMR 26000 3. Markup: 15% of the total project cost 4. Slab details: a. Assume 1.5 m3 of cmcrete is required per m2 of surface area of slab b. Cost of concrete is OMR 25/ m3 c Slab reinforcing steel cost = OMR 3500 d. Formwork material cost = OMR 800 10 m 2 2 m 4 m 2 m 3 m 2 m 5. Labor details: a. Labor production rate: i. Formwork and steel reinfocring = 0.6 m2/hr ii. Concrete placing = 2.5 m2 /hr b. Labor cost is OMR 30/hr Item Quantity Unit labor Material Equipment Subcontractor Unit Direct cost Bid price price 1 Is 500 4000 1000 0 880 42 3150 7350 0 11000 Site preparation Excavation Foundation Slab Structural steel Land scaping m3 m3 m3 ton 4500 3800 1500 0 0 0 0 50000 200 0 0 1 Is 0 0 0 10000 Problem 3: complete all missing items in the cost estimating sheet. The project is a warehouse and the footprint dimesions is shown below. Project info: 1. Indirect cost (the proejct is expected to last 3 months; there is no minimum rental period: a. Rental of site trailers: OMR 400/month b. Vehicles: OMR 350/month c. Utilities: OMR 800/month d. Additional indirect cost :4.5 % of the total direct costs 2. Contingency: OMR 26000 3. Markup: 15% of the total project cost 4. Slab details: a. Assume 1.5 m3 of cmcrete is required per m2 of surface area of slab b. Cost of concrete is OMR 25/ m3 c Slab reinforcing steel cost = OMR 3500 d. Formwork material cost = OMR 800 10 m 2 2 m 4 m 2 m 3 m 2 m 5. Labor details: a. Labor production rate: i. Formwork and steel reinfocring = 0.6 m2/hr ii. Concrete placing = 2.5 m2 /hr b. Labor cost is OMR 30/hr Item Quantity Unit labor Material Equipment Subcontractor Unit Direct cost Bid price price 1 Is 500 4000 1000 0 880 42 3150 7350 0 11000 Site preparation Excavation Foundation Slab Structural steel Land scaping m3 m3 m3 ton 4500 3800 1500 0 0 0 0 50000 200 0 0 1 Is 0 0 0 10000

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting IFRS Edition

Authors: Donald E. Kieso, Jerry J. Weygandt, Terry D. Warfield

2nd Edition

1118443969, 978-1118443965

More Books

Students also viewed these Accounting questions

Question

What's the first step in stretching your retirement income?

Answered: 1 week ago

Question

=+For a different audience? In another tone of voice?

Answered: 1 week ago

Question

=+Can it illicit audience participation?

Answered: 1 week ago

Question

=+Create an open dialogue among users?

Answered: 1 week ago