Question
In recent years there has been a surge in the construc- tion of large dams in both developing and developed countries including Brazil, Ethiopia, Pakistan,
In recent years there has been a surge in the construc- tion of large dams in both developing and developed countries including Brazil, Ethiopia, Pakistan, and China. There are several reasons for this increased inter- est in dam building. Demand for electricity is expected to double worldwide between 2010 and 2035. Thus, hydroelectric power is seen as a cheap, available option for countries with river systems that allow for dams, particularly as it is a preferred option to dirtier coal- burning plants. Other arguments in favor of building these dams include their use for flood control, crop irri- gation, inland transportation, urban water supplies, and as a job creators. These are all powerful and tempting arguments in favor of building large dams. However, there is one important counter-argument to the push toward these hydropower megaprojects: they fail to offer the advantages they are assumed to provide.
There are several criticisms of large dam projects. First, megadams take on average nearly nine years to
complete. Thus, arguments that they will ease the bur- den of energy demands must be taken on faith; given their long lead times, they certainly are not an option for energy crisis situations. They also assume that all current circumstances (energy demand, population growth patterns, water availability, and energy prices) are likely to remain steady, or at least predictable, over the period in which the dam is developed, which can lead to dangerous assumptions of future benefits. Nige- ria's Kainji Dam, for example, has fallen short of gen- erating its expected hydroelectricity levels by as much as 70%. Also, cost and schedule projections to complete these dams are almost always grossly underestimated. In fact, research suggests that cost overruns for large dam projects average 96% higher than estimated costs; that is, actual project costs were nearly double the origi- nal estimates. Schedules for these dams averaged over- runs of 44%, or 2.3 years. Third, the cost in absolute terms for these large dam projects the countries investing in them. For example, Ethiopia's Grand Ethiopian Renaissance dam on the Nile River was projected to cost $4.8 billion when it was started in 2011. When completed in 2017, it ended up costing more than $10 billion, or one-quarter of Ethiopia's GDP. Instead of helping the economy and fostering growth, Ethiopia could be facing enormous problems paying off long-term debt from financing the dam. Nor is this a new phenomenon. Brazil's Itaipu Dam was built in the 1970s at a cost of almost $20 billion, or 240% more than projected. Since opening, it has been a drain on the country's finances. Despite producing electricity that is needed to support development in Brazil, it is unlikely that the costs of the Itaipu Dam will ever allow it to break even.
What is the solution? Countries such as Norway, which produces some 99% of its energy from hydro- power, have adopted a smaller, more flexible solution to the use of dams. The government encourages the devel- opment not of large megadams, but of smaller, more flexible plants designed to produce smaller volumes of electricity at more locations within the country. Thus, Norway currently supports some 1,000 smaller energy- producing dams that do not disrupt the natural flow
of rivers, cause no environmental impact, and produce cleaner energy.
Large megadams of the type that are being devel- oped around the planet are a tempting and expensive pursuit for most countries undertaking them. But with poor project development records historically, including huge cost and schedule overruns, these projects are typi- cally undertaken as much for the national prestige they offer. At the same time, countries that have invested pre- cious budget money in creating the dams are frequently disappointed with the results, including underutiliza- tion, decades of financial squeeze and debt obligation, and a failure to realize the expected benefits. When it comes to megadams, the energy they produce is usually neither abundant nor cheap.25
Questions
1. Given the history of large cost overruns associated with megadam construction, why do you believe they are so popular, especially in the developing world?
2. Develop an argument in support of megadam construction. Develop an argument against these development projects. can nearly bankrupt
Step by Step Solution
There are 3 Steps involved in it
Step: 1
1 Reasons for the Popularity of Megadam Construction a Perceived Economic Development and Prestige Megadams are often seen as symbols of economic development and national prestige Countries may undert...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started