Answered step by step
Verified Expert Solution
Question
1 Approved Answer
In September 2015, a 3.45 megawatt cooling heating, and power (CUP) system was placed in into operation tor Southeast Regional Hospital with 360 beds. The
In September 2015, a 3.45 megawatt cooling heating, and power (CUP) system was placed in into operation tor Southeast Regional Hospital with 360 beds. The CHP system was part of a new 20,000 sq. ft. central utility plant that provided the 800.000 sq ft. health-car facility with cooling, heating and power. By centralizing all of the utilities in one location. the hospital accrued significant energy savings, as well as improved maintenance efficiency. The financial facts related to the project are summarized as Installed cost: $2.3 million Annual energy cost savings: $760,000 Annual O& M costs $250,000 Project service life: 14 years Salvage value: $200,000 At an interest rate of 7%, what s the net savings per dollar invested
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started