Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Indizo Co. purchased land as a factory site for $107,200. The process of tearing down two old buildings on the site and constructing the factory

image text in transcribed
Indizo Co. purchased land as a factory site for $107,200. The process of tearing down two old buildings on the site and constructing the factory required 6 months. The company paid $11,256 to raze the old buildings and sold salvaged lumber and brick for $1,688. It paid legal fees of $496 for title imvestigation and drawing up the purchase contract. Indigo paid $590 to an engineering firm for a land survey, and $18,224 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insurance on the property cost $402. and a liability insurance premium paid during construction was $241. The contractor's charge for construction was $734.320. The company paid the contractor in two instaliments: $321,600 at the end of 3 months, and $412,720 upon completion interest costs of $45,560 were incurred to finance the construction. Determine the cost of the land and the cost of the building as they shouid be recorded on the books of Indigo Co. Assume that the land survey was for the bullding. Cost of the iand Cost of the building Indizo Co. purchased land as a factory site for $107,200. The process of tearing down two old buildings on the site and constructing the factory required 6 months. The company paid $11,256 to raze the old buildings and sold salvaged lumber and brick for $1,688. It paid legal fees of $496 for title imvestigation and drawing up the purchase contract. Indigo paid $590 to an engineering firm for a land survey, and $18,224 for drawing the factory plans. The land survey had to be made before definitive plans could be drawn. Title insurance on the property cost $402. and a liability insurance premium paid during construction was $241. The contractor's charge for construction was $734.320. The company paid the contractor in two instaliments: $321,600 at the end of 3 months, and $412,720 upon completion interest costs of $45,560 were incurred to finance the construction. Determine the cost of the land and the cost of the building as they shouid be recorded on the books of Indigo Co. Assume that the land survey was for the bullding. Cost of the iand Cost of the building

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

No Nonsense Project Auditing A Practical Guide For The PMO

Authors: Lisa Nash

1st Edition

0993403522, 978-0993403521

More Books

Students also viewed these Accounting questions