Information on 4 projects is given in the table below. If the firms WACC is 9% and two percentage points are added and subtracted for
Information on 4 projects is given in the table below. If the firms WACC is 9% and two percentage points are added and subtracted for above-average and below-average risk projects, respectively, which of the projects should the firm accept?
Project Degree of Risk IRR
A Below Average 6%
B Average 8%
C Above Average 12%
D Average 10%