Question
Installing mufflers at the O'Sullivan Garage in Golden, Colorado, involves five work elements. Jill O'Sullivan has timed workers performing these tasks seven times, with the
Installing mufflers at the O'Sullivan Garage in Golden, Colorado, involves five work elements. Jill O'Sullivan has timed workers performing these tasks seven times, with the results shown in the following table. Element Select correct muffler Remove old muffler Weld/install new muffler Check/inspect work Complete paperwork Performance Rating 110% 95% 105% 105% 135% 1 3 6 15 2 4 2 4 9 14 4 7 Observation (minutes) 3 5 7 15 25* 9 4 5 6 13 6 5 5 8 13 5 6 6 14 5 15 2 7 7 3 7 14 17" 6 Employee has lengthy conversations with boss (not job related). By agreement with her workers, Jill allows a 12% fatigue factor and a 12% personal-time factor. To compute the standard time for the work operation, Jill excludes all observations that appear to be unusual or nonrecurring. She does not want an error more than 5%. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) The normal time for the overall process = 38.71 minutes (round your response to two decimal places). a) The standard time for this process = 50.94 minutes (round your response to two decimal places). b) The number of observations that are required for a 99% confidence level within 5% accuracy = observations (round your response to the immediate higher whole number).
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started