Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Instructions: Build the flowchart that corresponds to the Matlab code shown below clearvars clc miu 25; sigma:=-15; i=50; lambda .05, .1, .2]; L= [2.492, 2.703,
Instructions: Build the flowchart that corresponds to the Matlab code shown below clearvars clc miu 25; sigma:=-15; i=50; lambda .05, .1, .2]; L= [2.492, 2.703, 2.86]; desplazamiento= [0, .25, .5, .75, 1.0, 1.5, 21; l=length (lambda) ; repe-2 ; d=length (desplazamiento); number of shifts stop=8000; t each phase ends when 1000 ARL are found Code fase1=normrnd (miu, sigma ,i,1); generate the first 100 values that separate phase 1 from phase 2 %% Limits and first 100 Zs %% for q=1:1 for loop of each lambda value 1 cs=mu + L (q) * sigma" sqrt( 1 ambda (q) / (2-lambda(q)) ; 1 ci=miu- L (g) * sigma" sqrt(lambda (q) / (2-1ambda(g)) ; for t=3 :i+1 for loop of the first 100 Zs upper lower control control limit limit s(t-1-lambda (g) *fasel (t-2, 1l+ (1-lambda (q) ) *2(t-2) ; end for w=1:d for loop of each shift of the mean for e=1:repe % for loop of ARL %% To calculate Run Length r=1; to control the counter of the while that determines the 1000 ARL while r
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started