Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Introduction: Assume that you are the project coordinator for WolfCo Power and that you have been directed to appropriate funding for four projects. The projects
Introduction: Assume that you are the project coordinator for WolfCo Power and that you have been directed to appropriate funding for four projects. The projects have already been designed and bids from contractors have been accepted. The present total budget amount that you have available is $125,000. It is necessary to construct each of the four projects but it is not essential to accept all of the alternates associated with each of the project bids. The alternates are arranged such that each more expensive alternate includes all the alternates above it. Your task, as project coordinator, is to recommend the project alternates that will most effectively utilize the overall project budget, i.e., to use as much of the funding as you can without exceeding the budget while using the lowest marginal cost to benefit ratio at each step of the process. The matrix of projects, project costs, and project benefits is below. All values are in thousands of US Dollars: B AC/AB Project 1 1.1 Nothing 1.2 Cheap 1.3 Moderate 1.4 Expensive Project Options Matrix | AC/AB 30 Project 2 0 0 2.1 Nothing 35 ? 2.2 Cheap 5 9 ? 2.3 Moderate 1320 ? 2.4 Expensive 45 0 0 2 20 17 45 18 55 ? ? ? I/ 8 0 30 X 0 0 Project 3 3.1 Nothing 3.2 Cheap 3.3 Moderate 3.4 Expensive WO 1 Project 4 4.1 Nothing 4.2 Cheap 4.3 Moderate 4.4 Expensive 2 7 9 ? ? ? 3 3 10 13 15 17 20 Ulalala 4 Required: Fill in the details on the incomplete project matrices presented above. An additional matrix with other project information is presented on sheet 2. Make additional copies of sheet 2 as needed and complete each section as required to indicate the best way to utilize the project available funding. It should be fairly obvious that there are more projects than there is money. Be sure to complete all details on all duplicated sheets so that the reasons for making each decision is clear AC/AB | AC/AB 45 Project 1 1.1 Nothing 1.2 Cheap 1.3 Moderate 1.4 Expensive CB 30X 0 0 3 5 59 1320 Project 2 2.1 Nothing 2.2 Cheap 2.3 Moderate 2.4 Expensive 0 2 0 20 45 55 17 18 8 0 Project 3 3.1 Nothing 3.2 Cheap 3.3 Moderate 3.4 Expensive 0 2 1 Project 4 4.1 Nothing 4.2 Cheap 4.3 Moderate 4.4 Expensive 30 0 0 3 10 13 15 17 20 3 4 7 9 AC Total Cost Project Description (Number.Phase) 1 Base Projects (1.0, 2.0, 3.0, & 4.0) 2 113 3 4 5 6 7 8 9 10 11 Introduction: Assume that you are the project coordinator for WolfCo Power and that you have been directed to appropriate funding for four projects. The projects have already been designed and bids from contractors have been accepted. The present total budget amount that you have available is $125,000. It is necessary to construct each of the four projects but it is not essential to accept all of the alternates associated with each of the project bids. The alternates are arranged such that each more expensive alternate includes all the alternates above it. Your task, as project coordinator, is to recommend the project alternates that will most effectively utilize the overall project budget, i.e., to use as much of the funding as you can without exceeding the budget while using the lowest marginal cost to benefit ratio at each step of the process. The matrix of projects, project costs, and project benefits is below. All values are in thousands of US Dollars: B AC/AB Project 1 1.1 Nothing 1.2 Cheap 1.3 Moderate 1.4 Expensive Project Options Matrix | AC/AB 30 Project 2 0 0 2.1 Nothing 35 ? 2.2 Cheap 5 9 ? 2.3 Moderate 1320 ? 2.4 Expensive 45 0 0 2 20 17 45 18 55 ? ? ? I/ 8 0 30 X 0 0 Project 3 3.1 Nothing 3.2 Cheap 3.3 Moderate 3.4 Expensive WO 1 Project 4 4.1 Nothing 4.2 Cheap 4.3 Moderate 4.4 Expensive 2 7 9 ? ? ? 3 3 10 13 15 17 20 Ulalala 4 Required: Fill in the details on the incomplete project matrices presented above. An additional matrix with other project information is presented on sheet 2. Make additional copies of sheet 2 as needed and complete each section as required to indicate the best way to utilize the project available funding. It should be fairly obvious that there are more projects than there is money. Be sure to complete all details on all duplicated sheets so that the reasons for making each decision is clear AC/AB | AC/AB 45 Project 1 1.1 Nothing 1.2 Cheap 1.3 Moderate 1.4 Expensive CB 30X 0 0 3 5 59 1320 Project 2 2.1 Nothing 2.2 Cheap 2.3 Moderate 2.4 Expensive 0 2 0 20 45 55 17 18 8 0 Project 3 3.1 Nothing 3.2 Cheap 3.3 Moderate 3.4 Expensive 0 2 1 Project 4 4.1 Nothing 4.2 Cheap 4.3 Moderate 4.4 Expensive 30 0 0 3 10 13 15 17 20 3 4 7 9 AC Total Cost Project Description (Number.Phase) 1 Base Projects (1.0, 2.0, 3.0, & 4.0) 2 113 3 4 5 6 7 8 9 10 11
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started