Introduction: For this part of the project, you will complete the estimate for the Residential Building Project. You will incorporate bids for drywall, flooring, painting,

Introduction: For this part of the project, you will complete the estimate for the Residential Building Project. You will incorporate bids for drywall, flooring, painting, plumbing, HVAC, and electrical, add profit, and submit the final bid. Your costs should be added to the Project Estimate Summary sheet from Project Part 7 .

Tasks:
You have received the following bid for the drywall for the Residential Building Project found in Appendix B of the Estimating in Building Construction. Enter this cost on the Project Estimate Summary sheet.

SKR DRYWALL
We propose to furnish, install, and finish the drywall to complete the Residential Building Project (found in Appendix B of the Estimating in Building Construction) for the sum of $7,400. The price includes sales tax.

You have received the following bid for the flooring for the Residential Building Project. Enter this cost on the Project Estimate Summary sheet.

RJ'S FLOORS
We propose to furnish and install the resilient flooring, carpet, and vinyl base to complete the Residential Building Project (found in Appendix B of the Estimating in Building Construction) for the sum of $8,856. The price includes sales tax.

You have received the following bid for the painting for the Residential Building Project found in Appendix B of the Estimating in Building Construction. Enter this cost on the Project Estimate Summary sheet.

ABC PAINTING
We propose to furnish and install the painting, include primer and minor touch-up of drywall, to complete the Residential Building Project for the sum of $2,949. The price includes sales tax.

You have received the following bid for the HVAC for the Residential Building Project found in Appendix B of the Estimating in Building Construction. Enter this cost on the Project Estimate Summary sheet.

C&H HEATING AND COOLING
We propose to furnish and install the heating and cooling system, including the natural gas lines, to complete the Residential Building Project for the sum of $7,500. The price includes sales tax. Connection of the gas lines to the water heater is excluded.

You have received the following bid for the plumbing for the Residential Building Project found in Appendix B of the Estimating in Building Construction. Enter this cost on the Project Estimate Summary sheet.

L&M PLUMBING
We propose to furnish and install the plumbing to complete the Residential Building Project for the sum of $11,449. The price includes sales tax. The connection of the water heater to the gas line is included. The gas lines are excluded.

You have received the following bid for the electrical for the Residential Building Project found in Appendix B of the Estimating in Building Construction. Enter this cost on the Project Estimate Summary sheet.

B&B FINISH CARPENTRY
We propose to furnish and install the electrical to complete the Residential Building Project for the sum of $10,213. The price includes sales tax and a $1,000 allowance for light fixtures.

Add 15 percent profit to the labor, materials, and equipment costs. Add five percent profit to the subcontractor costs.

Double-check the Project Estimate Summary sheet, making sure that all of the required blanks have been filled in and that the numbers entered on the spreadsheet from your calculations and the subcontractor bids are correct.

Enter the total cost from the Project Estimate Summary sheet on the Bid Form you prepared in Part 1 of this project.

Make sure that you have properly filled out the Bid Form.

Submit the Bid Form, the Project Estimate Summary sheet, and all backup documentation (your calculations, etc.) to your instructor. The backup should include backup documents for all six weeks of the course.

Step by Step Solution

3.37 Rating (163 Votes )

There are 3 Steps involved in it

Step: 1

Based on the bids received the estimated costs for the Residential Building Project are as follows D... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Statistics And Data Analysis

Authors: Roxy Peck, Chris Olsen, Tom Short

6th Edition

1337793612, 978-1337793612

More Books

Students also viewed these Databases questions

Question

What is Larmors formula? Explain with a suitable example.

Answered: 1 week ago