Answered step by step
Verified Expert Solution
Question
1 Approved Answer
introduction to operations research Sleek Sdn. Bhd. is planning on introducing 2 new stool designs (Deni 8: Arni) for their 2022 furniture catalogue. Each stool
introduction to operations research
Sleek Sdn. Bhd. is planning on introducing 2 new stool designs (Deni 8: Arni) for their 2022 furniture catalogue. Each stool is made up of 4 legs and 1 seat. Both designs use the same seat. Deni has shorter (1.5 foot) legs, while Ami has longer (2.5 foot} legs. It takes 0.1 hours of labour to cut and shape a short leg, 0.15 hours to do the same for a long leg, and 0.5 hours to produce a seat. It takes an additional 0.3 hours to attach a set of legs to a seat for either design. The estimated prolit is FtM25 for each Deni sold and RM45 for each Ami sold. Sleek has unlimited access to material for seats, but only has 500 feet of material for the legs, and 75 labour hours available. Formulate a Linear Program for Sleek Sdn. Bhd. that optimises profit. Assume that Sleek is able to sell all stools that they make and that they must have zero leftover legs and seatsStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started