Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Is the average time to complete an obstacle course different when a patch is placed over the right eye than when a patch is

image text in transcribed

Is the average time to complete an obstacle course different when a patch is placed over the right eye than when a patch is placed over the left eye? Thirteen randomly selected volunteers first completed an obstacle course with a patch over one eye and then completed an equally difficult obstacle course with a patch over the other eye. The completion times are shown below. "Left" means the patch was placed over the left eye and "Right" means the patch was placed over the right eye. Time to Complete the Course Right 46 44 48 49 40 41 46 45 Left 45 44 47 47 33 38 44 41 Assume a Normal distribution. What can be concluded at the the a = 0.05 level of significance level of significance? For this study, we should use t-test for the difference between two dependent population means a. The null and alternative hypotheses would be: Ho: ud H ud b. The test statistic = c. The p-value = 0 (please enter a decimal) 0 (Please enter a decimal) (please show your answer to 3 decimal places.) (Please show your answer to 4 decimal places.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Elementary And Intermediate Algebra Concepts And Applications

Authors: Marvin L. Bittinger, David J. Ellenbogen, Barbara L. Johnson

5th Edition

0321559444, 9780321559449

More Books

Students also viewed these Mathematics questions