Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

It is desired to install a stirred holding tank for a clean fluid with a kinematic viscosity of 1 centiStoke. The control objective is to

It is desired to install a stirred holding tank for a clean fluid with a kinematic viscosity of 1 centiStoke. The control objective is to keep the level in the tank constant employing a combination of feedback and feedforward control. The tank has a diameter of 1 m and a height of 3 m. The flow rate into the tank is coming from another part of the plant and is around 1 m3/min 0.2 m3/min. The flow rate coming into the tank is to be measured with a turbine-based flow rate sensor. A valve is to be installed to manipulate the flow rate out of the tank. A level sensor is to be used for monitoring of the level in the tank. Develop a mathematical model of the process. Propose a control scheme and select hardware and all peripherals to satisfy the control objective. Feel free to assume whatever additional information that you may need and report with all the other assumptions that you are going to make.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Mass And Heat Transfer Analysis Of Mass Contactors And Heat Exchangers

Authors: T. W. Fraser Russell, Anne Skaja Robinson, Norman J. Wagner

1st Edition

0521886708, 9780521886703

More Books

Students also viewed these Chemical Engineering questions

Question

3. Outline the four major approaches to informative speeches

Answered: 1 week ago

Question

4. Employ strategies to make your audience hungry for information

Answered: 1 week ago