Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

ITEC 6 3 0 Information Systems Analysis, Modeling, and Design Individual Project Assignment Purpose The purpose of the individual system analysis and design project is

ITEC 630
Information Systems Analysis, Modeling, and Design
Individual Project Assignment
Purpose
The purpose of the individual system analysis and design project is to demonstrate students ability to apply the knowledge learned in this course to a real-world project.
Topics Suggestions
1. The system analysis and design project must be realistic and it will be done using techniques covered in this course. The list of topics suggested for this project is as follows:
Student record system
2. The above list is meant to be suggestive and if you have an idea about a specific topic, please consult with your instructor early to determine if it is suitable for the course.
3. You have to select and submit the project topic for instructors approval by the end of Week 2.
Project Deliverables
The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the phase 3, students are required to use the MS Project software for their project schedule.
The deadline for the Individual Project can be found in the schedule section of the class syllabus.
The following layout format covering a title page and all three phases is recommended for the project.
Title page (project name, author, and date)
Phase 1: Requirement analysis
A. Problem definition
B. Issues
C. Objectives
D. Requirements
E. Constraints
F. Description of the proposed system
G. Logical model design
Data flow diagrams
Context diagram
Diagram 0
Diagram 1(Diagram 1 is optional)
Descriptions of processes in each diagram
Descriptions of outputs/inputs/performance/security or controls
H. Specific requirements, if any (interface, operational, resource, performance, etc.)
Phase 2: System and database design
A. User interface
Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.
How data will be input to the system?
The physical layout for each input
The input design and procedures
How data will be output from the system?
The physical layout for each output
The output design and procedures
B. Data design
Develop a plan for data organization, storage, updating, and retrieval.
Database design
Database tables with their attributes should be presented
Primary key(s) should be identified in each table, if any
Three steps of normalization should be included.
Entity-relationship diagrams
Data file storage and access
C. System architecture
Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.
Phase 3: Project plan
A list of tasks or activities needed for implementing the proposed system
Estimating completion time and costs
A project schedule for performing those activities (Gantt charts or PERT charts)
Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software.
I

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Modern Database Management

Authors: Jeffrey A. Hoffer Fred R. McFadden

9th Edition

B01JXPZ7AK, 9780805360479

More Books

Students also viewed these Databases questions