Jef Machine Shop manufactures jacks and other lifting equipment. One order comes from Jun, Inc. for 2,000 jacks, which showed the following costs per unit:
Jef Machine Shop manufactures jacks and other lifting equipment. One order comes from Jun, Inc. for 2,000 jacks, which showed the following costs per unit:
Materials 40.00
Labor 17.50
FOH is 160% of direct labor cost (with 10% allowance for reworking defective units)
Final inspection revealed that 150 of the jacks were not properly produced. Correction of each unit requires 2.00 for materials, 3.00 for labor and factory overhead at an appropriate rate.
1. If defect is the result of internal failure, what is the cost of each unit of jacks produced?
2. If defect is the result of change in specifications imposed by the customer, what is the cost of each unit of jacks produced?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Absolutely lets calculate the cost per unit for Jef Machine Shop in both scenarios 1 Internal Failure Scenario In this case the defect arises from Jef Machine Shops internal processes Well factor in t...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started