Job Costing Project due by 2021 December 10 Instructions: Please prepare the Job Costing Journaling and accounts for the project below. Your answers must be in Excel Specadsheet format and should be emailed to me by December 10 You must name the file with your last name, first name and project name.se Dial Lucy Job Costing Project Falt2021 Project Question: Barney Incorporated is a printing company. The company uses normal casting to cost cach job Its job costing system has two direct-cost categories (direct materials and direct manufacturing labor) and one indirect cost pool (manufacturing overhead, allocated on the basis of direct manufacturing labor costs) 930 S $ S 750 100 1.350 750 s s S 3.50 500 The following data (in thousands) pertain to 2019. Direct materials and supplies purchased on credit Direct materials used Indirect materials issued to various production departments Direct manufacturing lahor Indirect manufacturing labor incurred by various production department Depreciation on building and manufacturing equipment Miscellaneous manufacturing overhead incurred by various production departments fordimarily would be detailed as repairs,photocopying, utilities ele Manufacturing overhead allocated at 150% of direct dating labor costs Cods of goods manufactured Revens Cost of goods sold (hefore adjustment for under overallocated manufacturing overhead Inventories December 31, 2018 (not 2019 Materials Work in Process Control Finished Goods Control S4200 S 8.000 5 4,050 S s $ 100 60 500 Required 1. Prepare journal entries to summarize the 2019 transactions. As your final entry, dispose of the year-end under-or overallocated manufacturing overhead as a write-off to Cost of Goods Sold Number your entries. Explanations for each enery may be omitted 2. Show posted accounts for all inventories. Cost of Goods Sold, Manufacturing Overhead Control, and Manufacturing Overhead Allocated 3. How did the company perform in 2019 Job Costing Project due by December 10" 2021 Instructions: Please prepare the Job Costing Journaling and T-accounts for the project below. Your answers must be in Excel Spreadsheet format and should be emailed to me by December 10. You must name the file with your last name, first name and project name. i.e. Diala_Lucy_Job_Costing Project_Fall2021 Project Question: Barney Incorporated is a printing company. The company uses normal costing to cost each job. Its job-costing system has two direct-cost categories (direct materials and direct manufacturing labor) and one indirect-cost pool (manufacturing overhead, allocated on the basis of direct manufacturing labor costs) 750 s 920 $ $ 100 $1,350 S 750 S S 350 SOO The following data (in thousands) pertain to 2019: Direct materials and supplies purchased on credit Direct materials used Indirect materials issued to various production departments Direct manufacturing labor Indirect manufacturing labor incurred by various production departments Depreciation on building and manufacturing equipment Miscellaneous manufacturing overhead incurred by various production departments (ordinarily would be detailed as repairs photocopying, utilities, etc Manufacturing overhead allocated at 150% of direct manufacturing labor costs Costs of goods manufactured Revens Cost of goods sold (before adjustment for under - overallocated manufacturing overhead) Inventories December 31, 2018(not 2019) Materials Control Work-in-Process Control Finished Goods Control $4,200 8,000 S 4,050 100 s s s 60 500 Required: 1. Prepare journal entries to summarize the 2019 transactions. As your final entry, dispose of the year-end under-or overallocated manufacturing overhead as a write-off to Cost of Goods Sold Number your entries. Explanations for each entry may be omitted. 2. Show posted T-accounts for all inventories. Cost of Goods Sold, Manufacturing Overhead Control, and Manufacturing Overhead Allocated. 3. How did the company perform in 2019