Job X was charged $200 and $250 for direct materials and direct labor, respectively. Its total job cost was $800. A plantwide predetermined overhead rate
Job X was charged $200 and $250 for direct materials and direct labor, respectively. Its total job cost was $800. A plantwide predetermined overhead rate is used to apply overhead to production based on direct labor dollars. How much manufacturing overhead was applied to Job X? Multiple Choice
$250
$550
$450