John Printing has contracts to complete weekly supplements required by forty-six customers. For the year 2019, manufacturing overhead cost estimates total $420,000 for an annual
John Printing has contracts to complete weekly supplements required by forty-six customers. For the year 2019, manufacturing overhead cost estimates total $420,000 for an annual production capacity of 10 million pages.
For 2019 John Printing decided to evaluate the use of additional cost pools. After analyzing manufacturing overhead costs, it was determined that number of design changes, setups, and inspections are the primary manufacturing overhead cost drivers. The following information was gathered during the analysis:
Cost pool Manufacturing overhead costs Activity level
Design changes $60,000 200 design changes
Setups 320,000 4,000 setups
Inspections 40,000 16,000 inspections
Total manufacturing overhead costs $420,000
During 2019, two customers, Roadward Insurance and Sadless Systems, are expected to use the following printing services:
Activity Roadward Insurance Sadless Systems
Pages 60,000 76,000
Design changes 10 2
Setups 20 10
Inspections 30 38
52) If manufacturing overhead costs are considered one large cost pool and are assigned based on 10 million pages of production capacity, what is the cost driver rate?
A) $0.25 per page
B) $0.05 per page
C) $0.025 per page
D) $0.042 per page
E) $0.42 per page
53) Using pages printed as the only overhead cost driver, what is the manufacturing overhead cost estimate for Sadless Systems during 2019?
A) $19,000
B) $3,800
C) $1,900
D) $2,520
E) $3,192
54) Assuming activity-cost pools are used, what are the activity-cost driver rates for design changes, setups, and inspections cost pools?
A) $300 per change, $80 per setup, $2.50 per inspection
B) $250 per change, $80 per setup, $3.75 per inspection
C) $210 per change, $2.50 per setup, $26.25 per inspection
D) $300 per change, $125 per setup, $4.00 per inspection
E) $300 per change, $2.50 per setup, $80 per inspection
55) Using activity-based costing to allocate overhead costs, what is the total manufacturing overhead cost estimate for Sadless Systems during 2019?
A) $3,113.75
B) $1,495.00
C) $2,068.00
D) $3,412.50
E) $3,665.00
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started