Question
Jomit plc has budgeted for the following overhead costs for Period 6. Material receipt costs 31,200 Power costs 39,000 Material handling costs 27,300 The company
Jomit plc has budgeted for the following overhead costs for Period 6. Material receipt costs 31,200 Power costs 39,000 Material handling costs 27,300 The company produces 3 products, P, Q and R for which the following budgeted information is available for Period 6. Product P Q R Output (units) 4,000 3,000 1,600 Material batches 20 10 32 Per Unit Direct material (kg) 4 6 3 Direct material () 6 5 9 Direct labour (hours) 0.2 0.5 1.0 Number of power operations 6 3 2 Direct labour rate per hour 8 8 8 Currently the overhead costs are each absorbed using a rate per direct labour hour. However, the company is considering applying overheads using an ABC approach and has identified drivers for the activities as follows: Material receipt costs number of batches of material Power costs number of power operations Material handling costs kg of material handled You are required to calculate: (a) The total cost per unit for each product using the current overhead absorption method. (b) The total cost per unit for each product using the ABC method.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started