Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model Deluxe Model 25,100 30,100 555 855 85 505 Total estimated overhead costs are $322,070, of which $155,100 is assigned to the material handling cost pool and $166,970 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. 2. Calculate the overhead assigned to each product using ABC. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Calculate the overhead assigned to each product using the traditional cost system. (Round the overhead rate to four decimal places and round your final answer to the nearest whole dollar amount.) Overhead Assigned Standard Model Deluxe Model machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Standard Model Deluxe Model 25,100 30,100 555 855 85 505 k Total estimated overhead costs are $322,070, of which $155,100 is assigned to the material Handling cost p assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. 2. Calculate the overhead assigned to each product using ABC. nces Complete this question by entering your answers in the tabs below. Required 1 Required 2 Calculate the overhead assigned to each product using ABC. Overhead Assigned Standard Model Deluxe Model