Question
Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver
Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow:
Standard Model | Deluxe Model | |||
Number of machine hours | 26,000 | 31,000 | ||
Number of material moves | 600 | 900 | ||
Number of setups | 90 | 550 | ||
Total estimated overhead costs are $344,380, of which $157,500 is assigned to the material handling cost pool and $186,880 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. (Round the overhead rate to four decimal places.)
|
2. Calculate the overhead assigned to each product using ABC.
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started