Question
Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver
Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow:
Standard Model | Deluxe Model | |||
Number of machine hours | 26,400 | 31,400 | ||
Number of material moves | 620 | 920 | ||
Number of setups | 70 | 570 | ||
Total estimated overhead costs are $358,840, of which $169,400 is assigned to the material handling cost pool and $189,440 is assigned to the setup cost pool.
1. Calculate the overhead assigned to each product using the traditional cost system. (Round the overhead rate to four decimal places.)
Overhead Assigned | |
Standard model | |
Delux model |
2. Calculate the overhead assigned to each product using ABC. (Round the overhead rate to four decimal places.)
Overhead Assigned | |
Standard Model | |
Delux Model |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started