Kolbys Korndogs is looking at a new sausage system with an installed cost of $910,000. This cost will be depreciated straight-line to zero over the
Kolbys Korndogs is looking at a new sausage system with an installed cost of $910,000. This cost will be depreciated straight-line to zero over the projects seven-year life, at the end of which the sausage system can be scrapped for $105,000. The sausage system will save the firm $193,000 per year in pretax operating costs, and the system requires an initial investment in net working capital of $51,000. Required: What is the aftertax salvage value of the equipment? (Do not round intermediate calculations. Round your answer to the nearest whole number (e.g., 32).) Aftertax salvage value $ 73500 What is the annual operating cash flow? (Do not round intermediate calculations. Round your answer to the nearest whole number (e.g., 32).) OCF $ 390000 If the tax rate is 30 percent and the discount rate is 6 percent, what is the NPV of this project? (Do not round intermediate calculations. Round your answer to 2 decimal places (e.g., 32.16).)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started