Question
Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours.
Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follow: |
Mercon | Wurcon | |||
Direct materials cost per unit | $ | 13.00 | $ | 11.00 |
Direct labor cost per unit | $ | 10.00 | $ | 13.00 |
Direct labor-hours per unit | 0.30 | 1.25 | ||
Number of units produced | 5,000 | 10,000 | ||
|
These products are customized to some degree for specific customers. |
Required: | |
1. | The company's manufacturing overhead costs for the year are expected to be $420,000. Using the company's conventional costing system, compute the unit product costs for the two products. (Do not round intermediate calculation. Round your final answers to 2 decimal places.) |
2. | Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year: |
Mercon | Wurcon | Total | |
Engineering design time (in hours) | 2,000 | 2,000 | 4,000 |
|
Compute the unit product costs for the two products using the proposed ABC system. (Do not round intermediate calculation. Round your final answers to 2 decimal places.) |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started