Question
Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours.
Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follow:
Mercon | Wurcon | |||||
Direct materials cost per unit | $ | 8.00 | $ | 5.00 | ||
Direct labor cost per unit | $ | 7.00 | $ | 9.00 | ||
Direct labor-hours per unit | 0.20 | 1.80 | ||||
Number of units produced | 10,000 | 20,000 | ||||
These products are customized to some degree for specific customers.
Required:
1. The company's manufacturing overhead costs for the year are expected to be $1,140,000. Using the company's conventional costing system, compute the unit product costs for the two products.
2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year:
Mercon | Wurcon | Total | |||||||
Engineering design time (in hours) | 5,000 | 5,000 | 10,000 | ||||||
Compute the unit product costs for the two products using the proposed ABC system.
(For all requirements, do not round intermediate calculations. Round your final answers to 2 decimal places.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started