Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours.
Kunkel Company makes two products and uses a conventional costing system in which a single plantwide predetermined overhead rate is computed based on direct labor-hours. Data for the two products for the upcoming year follow:
Mercon | Wurcon | |
---|---|---|
Direct materials cost per unit | $ 14.00 | $ 12.00 |
Direct labor cost per unit | $ 8.00 | $ 9.00 |
Direct labor-hours per unit | 1.50 | 11.25 |
Number of units produced | 1,000 | 2,000 |
These products are customized to some degree for specific customers.
Required:
1. The company's manufacturing overhead costs for the year are expected to be $960,000. Using the company's conventional costing system, compute the unit product costs for the two products.
2. Management is considering an activity-based costing system in which half of the overhead would continue to be allocated on the basis of direct labor-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year:
Mercon | Wurcon | Total | |
---|---|---|---|
Engineering design time (in hours) | 4,000 | 4,000 | 8,000 |
Compute the unit product costs for the two products using the proposed ABC system.
(For all requirements, do not round intermediate calculations. Round your final answers to 2 decimal places.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started