LCOE isLevelized Cost of Energy A proposed wind project in Minnesota is estimated to have an average power output that is 35% of the capacity
LCOE isLevelized Cost of Energy
A proposed wind project in Minnesota is estimated to have an average power output that is 35% of the capacity of the project (168 MW). The project is being financed over 20 years with 56% of the TIC = exist290 million financed via equity at a rate of 11% and 44% of the TIC financed via debt at a rate of 4%. The recurring costs include exist0.02/kWh plus an annual cost of 55039 each year. Calculate the following for this project: a) Annual energy production for this turbine in MWh (rounded to 2 decimal places) 123 b) Fixed charge rate in decimals (not %) (rounded to 3 decimal places) 123 LCOE in exist/kWh (rounded to 3 decimal places) 123Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started