Question
Leisure Chairs is a small manufacturer of two types of popular leisure chairs, the SlingChairs and the Adirondack models. The company is developing a daily
Leisure Chairs is a small manufacturer of two types of popular leisure chairs, the SlingChairs and the Adirondack models. The company is developing a daily production plan and wants to know how many chairs of each kind should be produced each day.
The manufacturing process consists of two departments: fabrication and finishing. The fabrication department has 10 skilled workers, each of whom works 8 hours per day. The finishing department has 5 workers, each of whom works a 8-hour shift per day.
Each pair of SlingChairs requires 3.5 labor hours in the fabrication department and 2 labor hours in finishing. The Adirondack model requires 4.5 labor-hours in fabrication and 3.5 labor-hours in finishing.
The company operates 6 days a week. It makes a per unit profit of $57 on the SlingChair model and $68 on the Adirondack model.
The company anticipates selling at least twice as many Adirondack models as SlingChairs models.
An intern working at company was asked to develop a spreadsheet model. (Help the intern formulate and work with the model).
When solved the optimization model resulted in following outcome
Decision Variables Sling Chairs (S) | Adirondack (A) 4.4 8.9 ANSWER A B C D Indicate A/B/C/D In this problem intern must have 1 formulated the A. -2S + 1A B. -2S+ 1A C. 2S + 1A= D. none of = 0 Market mix these constraint as: What will be the 2 profit contribution A. 351.11 B. 253.33 from C. 11.00 D. 857.78 SlingChairs? What will be the 3. profit contribution A. 253.33 from Adirondack B. 11.00 C. 604.44 D. 351.11 chairs? What is the total 4 A. 125.00 D. B. 857.78 C. 5146.67 profit generated? 3626.67 What is the total number of hours 5 available for A. 8 B. 48 C. 80 D. 480 fabrication operation?What is the total number of hours available for the finishing operation? What is the total number of hours used for fabrication operation? What is the total number of hours used for the finishing operation? What is the value of slack? If Leisure Chairs is hiring another employee, based . B. on your analysis, Marketing Finishing Fabrication which department should it hire forStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started