Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Lightsaber, Inc. manufactures two models of high-pressure steam valves, the BB7 model and the BB8 model. Budgeted manufacturing overhead cost and operating data regarding production

Lightsaber, Inc. manufactures two models of high-pressure steam valves, the BB7 model and the BB8 model. Budgeted manufacturing overhead cost and operating data regarding production and sales of 2,000 units of the BB7 model and 8,000 units of the BB8 model for 2023 follow:

Budgeted Level for Cost Driver
Activity Cost Pool Budgeted Overhead Costs Cost Driver BB7 BB8 Total
Machine setups $800,000 Number of setups 150 100 250
Vendor negotiation 200,000 Number of parts 800 200 1,000
Assembly 400,000 Direct labour hours 4,000 36,000 40,000
$1,400,000

Required:

  1. Identify and briefly explain each of the three cost drivers as either unit-level or batch-level or product-level or organization-sustaining level.
  2. Calculate the budgeted manufacturing overhead cost for each unit of the two models, using only one unit-level cost driver.
  3. Calculate the budgeted manufacturing overhead cost for each unit of the two models, using the activity-based-costing (ABC) method.
  4. Assume Lightsaber, Inc. will use only the unit-level driver. Compared to the ABC method, by how much (in terms of total allocated/applied manufacturing overhead cost), if any, will the total output of each model be either under-costed or over-costed?
  5. Is the result obtained in part (4) above consistent with your expectations? Explain.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions