Question
LJE Ltd undertakes jobs for its clients who are billed when the jobs are completed. Job 101 Job 102 Job 103 Started May 2019 June
LJE Ltd undertakes jobs for its clients who are billed when the jobs are completed.
Job 101
Job 102
Job 103
Started
May 2019
June 2019
July 2019
Completed
June 2019
June 2019
August 2019
Cost information:
As at 31 May 2019
As at 31 July 2019
K'000
K'000
Direct material
10.0
8.0
Direct labour (960 hrs @ K50
48.0
Direct labour 1040 @ K50)
52.0
Production overhead
See below
See below
See below
Additional information about the three jobs are as follows:
(i)Direct material is introduced into jobs at the start of the jobs. Thus, material for Job 101 was introduced in May 2019, for jobs 102 and 103 direct material was introduced in June 2019
(ii)Material are bought in the month in which they are required and issued to jobs directly. Materials purchased in June 2019 cost K23,000. (See table above for more insights about jobs 102 and 103).
(iii)Direct labour at 31 May 2019 and 30 June 2019 was just half of the total labour cost in the respective jobs
(iv)The labour cost incurred in June was K160,000 (Note the direct labour for May and July 2019 for jobs 101 and 103)
(v)Overhead is absorbed into jobs on the basis of direct labour cost at the rate ofK0.5 per Kwacha in all the months
(vi)Jobs 101 (cost K154,000) and Job 102 were completed in June 2019. The cost of these completed jobs constituted cost of goods sold in June 2019 for LJE Ltd. Job 103 was still in progress at the end of July 2019.
(vii)The overheads incurred in June 2019 were K95,000
Required
For Job 101 calculate:
(a)The direct labour cost incurred in June 2019 and the total direct labour cost on the whole job.
(5 marks)
(b)The overhead cost absorbed into the job on its completion in June 2019
(3 marks)
For Job 102 calculate:
(a)The direct material cost
(3 marks)
(b)The direct labour cost
(4marks)
(c)The overhead absorbed into the job
(3 marks)
For job 103 Calculate the overhead cost absorbed into the job in July 2019 and the cost of work in progress as at 31 July 2019
(7 marks)
(Total 25 marks)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started