Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Lucy hired Ideal Pools to install an above-ground pool for her. Ideal Pools supplied both the materials and the labor. The contract included only the
Lucy hired Ideal Pools to install an above-ground pool for her. Ideal Pools supplied both the materials and the labor. The contract included only the total cost of the pool which was $3,000.00. Part of the material used to stabilize the pool rotted and the pool tilted as a result. Lucy is suing Ideal Pools under the UCC. Ideal Pools states the UCC is not applicable because the issue is the labor/work and not the materials/goods. Does Lucy have a claim under the UCC? Why or why not
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started