Question
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows: Standard Costs Actual Costs Direct materials 224,000 lbs. at $5.50 221,800 lbs. at $5.30 Direct labor 17,500 hrs. at $17.30 17,900 hrs. at $17.50 Factory overhead Rates per direct labor hr., based on 100% of normal capacity of 18,260 direct labor hrs.: Variable cost, $4.30 $74,500 variable cost Fixed cost, $6.80 $124,168 fixed cost Each unit requires 0.25 hour of direct labor.
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Materials Price Variance | $fill in the blank 1 | FavorableUnfavorableFavorable |
Direct Materials Quantity Variance | $fill in the blank 3 | FavorableUnfavorable |
Total Direct Materials Cost Variance | $fill in the blank 5 | FavorableUnfavorable |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Labor Rate Variance | $fill in the blank 7 | FavorableUnfavorable |
Direct Labor Time Variance | $fill in the blank 9 | FavorableUnfavorable |
Total Direct Labor Cost Variance | $fill in the blank 11 | FavorableUnfavorable |
c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance | $fill in the blank 13 | FavorableUnfavorable |
Fixed factory overhead volume variance | $fill in the blank 15 | FavorableUnfavorable |
Total factory overhead cost variance |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started