Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Macon - Inc - Project Management Case Studies by Harold Kerzner Macon was a fifty - year - old company in the business of developing
MaconInc Project Management Case Studies by Harold Kerzner
Macon was a fiftyyearold company in the business of developing test equipment for the tire industry. The company had a history of segregated departments with very focused functional line managers. The company had two major technical departments: mechanical engineering and electrical engineering. Both departments reported to a vice president for engineering, whose background was always mechanical engineering. For this reason, the company focused all projects from a mechanical engineering perspective. The significance of the test equipments electrical control system was often minimized when, in reality, the electrical control systems were what made Macons equipment outperform that of the competition. Because of the strong autonomy of the departments, internal competition existed. Line managers were frequently competing with one another rather than focusing on the best interest of Macon. Each would hope the other would be the cause for project delays instead of working together to avoid project delays altogether. Once dates slipped, fingers were pointed and the problem would worsen over time.
One of Macons customers had a service department that always blamed engineering for all of their problems. If the machine was not assembled correctly, it was engineerings fault for not documenting it clearly enough. If a component failed, it was engineerings fault for not designing it correctly. No matter what problem occurred in the field, customer service would always put the blame on engineering.
As might be expected, engineering would blame most problems on production claiming that production did not assemble the equipment correctly and did not maintain the proper level of quality. Engineering would design a product and then throw it over the fence to production without ever going down to the manufacturing floor to help with its assembly. Errors or suggestions reported from production to engineering were being ignored. Engineers often perceived the assemblers as incapable of improving the design. Production ultimately assembled the product and shipped it out to the customer. Oftentimes during assembly the production people would change the design as they saw fit without involving engineering. This would cause severe problems with documentation. Customer service would later inform engineering that the documentation was incorrect, once again causing conflict among all departments. The president of Macon was a strong believer in project management. Unfortunately, his preaching fell upon deaf ears. The culture was just too strong. Projects were failing miserably. Some failures were attributed to the lack of sponsorship or commitment from line managers. One project failed as the result of a project leader who failed to control scope. Each day the project would fall further behind because work was being added with very little regard for the projects completion date. Project estimates were based upon a gut feel rather than upon sound quantitative data. The delay in shipping dates was creating more and more frustration for the customers. The customers began assigning their own project managers as watchdogs to look out for their companies best interests. The primary function of
these watchdog project managers was to ensure that the equipment purchased
would be delivered on time and complete. This involvement by the customers was
becoming more prominent than ever before.
The president decided that action was needed to achieve some degree of excellence
in project management. The question was what action to take, and when.
Questions
Where will the greatest resistance for excellence in project management come
from?
What plan should be developed for achieving excellence in project management?
How long will it take to achieve some degree of excellence?
Explain the potential risks to Macon if the customers experience with project
management increases while Macons knowledge remains stagnant.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started