Answered step by step
Verified Expert Solution
Link Copied!

Question

...
1 Approved Answer

Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually. Madison would use the 3-year MACRS

Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually. Madison would use the 3-year MACRS method to depreciate the machine, and management thinks the machine would have a value of $33,000 at the end of its 5-year operating life. The applicable depreciation rates are 33.33%, 44.45%, 14.81%, and 7.41%. Working capital would increase by $35,000 initially, but it would be recovered at the end of the project's 5-year life. Madison's marginal tax rate is 40%, and a 13% cost of capital is appropriate for the project.

a.

  1. Calculate the project's NPV. Round your answer to the nearest dollar.
  2. Calculate the project's IRR. Round your answer to two decimal places.
  3. Calculate the project's MIRR. Round your answer to two decimal places.
  4. Calculate the project's payback. Round your answer to two decimal places.

b.

Assume management is unsure about the $110,000 cost savings - this figure could deviate by as much as plus or minus 20%. Calculate the NPV if cost savings value deviate by plus 20%. Round your answer to the nearest dollar.

$

Calculate the NPV if cost savings value deviate by minus 20%. Round your answer to the nearest dollar.

$

c.

Suppose the CFO wants to do a scenario analysis with different values for the cost savings, the machine's salvage value, and the working capital (WC) requirement. She asks you to use the following probabilities and values in the scenario analysis:

Scenario Profitability Cost savings Salvage value WC

Worst case 0.25 $88,000 $28,000 $40,000

Base Case 0.45 110,000 33,000 35,000

Best Case 0.30 132,000 38,000 30,000

Calculate the project's expected NPV. Round your answer to the nearest dollar.

$

Calculate the project's standard deviation. Round your answer to the nearest dollar.

$

Calculate the project's coefficient of variation. Round your answer to two decimal places.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Horngrens Accounting

Authors: Tracie L. Miller nobles, Brenda L. Mattison, Ella Mae Matsumura

12th edition

978-0134674681

Students also viewed these Accounting questions