Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually. Madison would use the 3-year MACRS

Madison Manufacturing is considering a new machine that costs $350,000 and would reduce pre-tax manufacturing costs by $110,000 annually. Madison would use the 3-year MACRS method to depreciate the machine, and management thinks the machine would have a value of $33,000 at the end of its 5-year operating life. The applicable depreciation rates are 33.33%, 44.45%, 14.81%, and 7.41%. Working capital would increase by $35,000 initially, but it would be recovered at the end of the project's 5-year life. Madison's marginal tax rate is 25%, and a 13% cost of capital is appropriate for the project. Calculate the project's NPV, IRR, MIRR, and payback. Do not round intermediate calculations. Round the monetary value to the nearest dollar and percentage values and payback to two decimal places. Negative values, if any, should be indicated by a minus sign. NPV: $ -38500 IRR: 11,65 % MIRR: 10.89 % The project's payback: 3.67 years Assume management is unsure about the $110,000 cost savings - this figure could deviate by as much as plus or minus 20%. Do not round intermediate calculations. Round your answer to the nearest dollar. Negative values, if any, should be indicated by a minus sign. Calculate the NPV if cost savings value deviate by plus 20%. $ 53,779.46 Calculate the NPV if cost savings value deviate by minus 20%. $ -22,297.31 Suppose the CFO wants you to do a scenario analysis with different values for the cost savings, the machine's salvage value, and the working capital (WC) requirement. She asks you to use the following probabilities and values in the scenario analysis: Scenario Probability Cost Savings Salvage Value WC Worst case 0.25 $ 88,000 $28,000 $40,000 Base case 0.45 110,000 33,000 35,000 Best case 0.30 132,000 38,000 30,000 Calculate the project's expected NPV, its standard deviation, and its coefficient of variation. Do not round intermediate calculations. Round the monetary values to the nearest dollar and a coefficient of variation to two decimal places. Negative values, if any, should be indicated by a minus sign. The project's expected NPV: $ 13901.21 Standard deviation: $ 29609.22 Coefficient of variation: 2.13

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Unlimited Business Financing

Authors: Trent Lee, Dr Chad Lee

1st Edition

1934275050, 9781934275054

Students also viewed these Finance questions